The Bridge Replacement Package 3 was one of 5 packages SCDOT procured to replace 13 bridges in South Carolina that were damaged beyond repair by the flooding in October 2015.

The Package 3 bridge sites are located in Fairfield (S-101), Florence (S-57), and Newberry (SC Route 34) Counties. Parrish & Partners provided project management, roadway design, structure design, bridge hydraulic analysis, drainage design, erosion and sediment control design, utility coordination, and environmental permitting. As a whole, the team also provided additional surveying, geotechnical investigation/design, and right of way acquisition services. Each site was on a fast-track design and construction schedule.

As part of the contract, our firm also provided and managed construction services, such as shop drawing and working drawing reviews, materials testing, and provided design assistance for any unforeseen construction-related issues.

Services:

  • Project Management
  • Bridge Design
  • Final Bridge Plans
  • Final Roadway Plans
  • Right of Way Plans
  • Environmental Permitting
  • Bridge Hydraulic Study
  • Roadway Drainage
  • Erosion and Sediment Control Design
  • Construction Support
  • Shop Drawing Review
Back to all Projects

At a Glance

Client SCDOT

Dates of Service March 2016 - November 2016

  • First 3 counties in SC
  • 3 bridges replaced
  • 75-foot simple-span bridge on S-57
  • 100-foot multiple-span bridge on S-101
  • 120-foot simple-span bridge along SC Route 34
  • 2018 Engineering Excellence Award